Keeping you going when disaster strikes
Most small to medium sized businesses have either not reviewed their business continuity plans for a long time, or don't have one at all. If your business is one of them, we can help you.
Teleostec can provide a thorough analysis of your business IT continuity. We can act as an independent advisor for this activity or it can be part of an IT network audit
Our BCP planning normally follows these steps:
- Identify systems to be protected
- Identify risks and degree of cover required for each
- Agree level of resilience and response time for each system in each risk scenario
- Identify physical resources available to UIB (people, sites, equipment)
- Identify current BC procedures and systems
- Assess correspondence between requirement and current position
- (Optionally) test current procedures and systems
This report will include tactical suggestions for improving the performance of existing procedures and systems; brief outlines for procedures and systems to enhance the existing provision on a tactical basis; identification of the voids and significant deficiences in the overall plan (if any). We will also be pleased to submit our proposal for a fully-worked BCP.
What to do next
If you would like to discuss your current business continuity situation, please contact us.